A practical workflow for coordinating ACM and rainscreen shop drawings around openings, joints, trims, flashings, penetrations, revisions and RFIs.

Start with the governing hierarchy

  1. Confirm the jurisdiction, permit date and applicable code or by-law.
  2. Lock the current architectural, envelope and structural drawing revisions.
  3. Confirm specifications, addenda, approved substitutions and consultant responses.
  4. Confirm the selected panel, attachment and membrane systems against current manufacturer instructions.
  5. Record contradictions as RFIs. Do not resolve them by copying a generic detail.

BC projects commonly reference the BC Building Code 2024; projects in the City of Vancouver use the applicable Vancouver Building By-law. The permit date and project-specific transition rules matter.

Openings: coordinate head, jamb and sill as one drainage path

Head

Coordinate membrane continuity, head flashing support, slope, end dams, drip projection, panel termination, cavity ventilation and the window or door supplier’s perimeter requirements.

Jamb

Coordinate the return depth, subframing, closure, membrane transition, sealant geometry and allowance for installation tolerances without blocking drainage.

Sill

Coordinate positive drainage, back dam or end dams where required, sill-pan or membrane continuity, weeps, cladding clearance and the path that carries incidental water outward.

Coordination example: show the head, jamb and sill on the same opening key, then trace the water-control layer and drainage path across all three views. This is a review method—not a substitute for the project detail.

Joints and panel modules

  • Establish control lines, panel orientation and the architectural module before detailing local conditions.
  • Distinguish drained/back-ventilated rainscreen joints from face-sealed or wet-seal systems.
  • Coordinate reveal width, gaskets or sealants, drainage openings and panel engagement with the selected attachment system.
  • Show movement joints from the governing design and keep cladding joints aligned only where the documents require it.
  • Coordinate cavity barriers and fire-stopping without assuming a generic location or product.
  • Keep finish orientation, lot control and protective-film requirements visible where the selected manufacturer requires them.

Trims, flashings and fabricated profiles

  • Identify material, thickness or gauge, finish and interface compatibility.
  • Show profile slopes, hems, end dams, drips, weeps and closure conditions.
  • Record developed widths and bend sequence only from verified geometry and fabrication constraints.
  • Coordinate splice locations, laps, sealants and fasteners with the drainage path.
  • Separate a representative profile from a fabrication ticket; the latter requires verified dimensions and release status.

Coordination example: a parapet profile can identify required functions—slope inward where required, hemmed edges, drip separation and membrane tie-in—while every project dimension remains a controlled input.

Penetrations and mounted equipment

  • Inventory louvres, vents, pipes, conduits, lights, cameras, signs, rails and exterior equipment.
  • Confirm who supplies sleeves, curbs, supports, flashings and perimeter seals.
  • Coordinate attachment back to structure without transferring unreviewed loads through cladding panels.
  • Maintain continuity of the water, air, thermal and fire-control layers.
  • Issue an RFI when the support, opening size, curb, fire-stop or sealant requirement is unknown.

Revisions, holds and RFIs

  1. Inventory each incoming revision before changing a drawing.
  2. Identify affected sheets, details, fabrication tickets and open RFIs.
  3. Supersede prior sheets; do not overwrite the issued record.
  4. Carry unresolved decisions as visible holds with an owner and required response.
  5. Release fabrication information only after the applicable review gate is complete.

Typical RFI triggers include conflicting opening dimensions, undefined transition membranes, missing attachment criteria, unconfirmed panel systems, absent fire-stopping requirements, incomplete penetration supports and field conditions that differ from the issued set.

Primary technical sources

Manufacturer links illustrate the level of product-specific information required. FPG does not substitute one manufacturer’s detail for another system.

Use the submission checklist, review FPG’s cladding shop drawing service, or start a controlled intake.