Stock and custom shim options are confirmed against the requested dimensions, quantity and availability.
1/16"
Fine adjust
Detail tolerance for cladding, trim and tight-fit assemblies.
1/8"
Standard
Everyday plumb-and-line shim for framing, sub-girts and panel back-up.
1/4"
Heavy load
Structural take-up at brackets, hangers and post bases.
Custom sizes
Custom
Send the required thickness, footprint and quantity for a feasibility and lead-time review.
Installation sequence
Illustrated panels. Clips. Assembly order.
An illustrative coordination drawing of a rainscreen assembly. Clip, sub-frame, insulation, barrier and panel selections must follow the approved project documents.
Air & vapour barrier
FRP thermal clip
Z-girt sub-frame
Mineral wool
ACM panel
System scaffold
01 Substrate02 AVB03 Clips04 Girts05 Insulation06 Panels & trim
The wall, layer by layer
Five layers between weather and people.
An illustrative rainscreen cross-section; layer order and interfaces must follow the approved project assembly.
01Exterior sheathing
02Air & vapour barrier
03Thermally-broken sub-girt
04Mineral wool CI
05Cladding panel
All services and useful resources
START WITH WHAT YOU HAVE
Tell us about your project.
A project location, service and short scope are enough to start a conversation. Drawings can follow through the secure intake.
A design elevation is zoned, cut, built up as an assembly, resolved at its interfaces and collated for project-team review. Diagrammatic only — no dimension, gauge, spacing or product is shown.
READY
01Elevation. The issued design drawing is the starting record.
02Zones and grid. Facade zones and a setting-out grid are traced over it.
03Section and barrier. The wall is cut; sheathing and the air and vapour barrier come first.
04Insulation to cavity. Exterior insulation, thermal clips, rails and the drained, vented cavity.
05Cladding and interfaces. The finish plane closes; base, parapet, corners, openings, transitions, end dams and weeps resolve.
06Coordinated package. The sheets collate for project-team review. Unknowns stay visible as holds.
NTS — DIMENSIONS ON HOLD; NO GAUGE, SPACING OR PRODUCT IS SHOWN OR IMPLIED
Project drawings, specifications, approved submittals, manufacturer instructions and applicable codes govern. The FPG Detail Library is a controlled reference and generation resource and does not replace project-specific design or approval.
Scope responsibility varies by project — coordinate with the approved responsibility matrix.
Fasteners shown are illustrative only. Type, material, spacing, embedment, edge distance and structural capacity must follow the approved project design and manufacturer requirements.
Building Envelope Value Engineering
How it works
1
Upload your project
Drawings, photos, specs, consultant reports, quotes, or insurance scopes.
2
FPG reviews your envelope
An FPG operator reviews the building-envelope scope.
3
Value-engineering options
FPG prepares budget, best-value, and premium / future-ready options.
4
You receive guidance
Operator-reviewed guidance you can compare and act on.