Share project information, compare scoped options and keep decisions with the project team.
01 / 04
Information
Share the project information through the existing intake controls below.
02 / 04
Options
Compare options within the agreed envelope scope.
03 / 04
Decisions
Keep project decisions and review responsibilities with the project team.
04 / 04
Report
Bring the reviewed comparison and decisions into the report.
Choose a chapter
Read the sequence and scope
Information. Share the project information through the existing intake controls below.
Options. Compare options within the agreed envelope scope.
Decisions. Keep project decisions and review responsibilities with the project team.
Report. Bring the reviewed comparison and decisions into the report.
Presentation only. Follow the specified project documents, selected system requirements and agreed review responsibilities. The reference geometry is illustrative and not to scale. Existing service limitations and technical notes remain below.
Value engineering often starts on the drawing board: our cladding shop-drawing service documents the assembly alternatives being priced.
When a value-engineering option changes the assembly build-out or finished face, FPG can coordinate facade alignment and material quantities against the building as measured.
Building Envelope Value Engineering
How it works
1
Upload your project
Drawings, photos, specs, consultant reports, quotes, or insurance scopes.
2
FPG reviews your envelope
An FPG operator reviews the building-envelope scope.
3
Value-engineering options
FPG prepares budget, best-value, and premium / future-ready options.
4
You receive guidance
Operator-reviewed guidance you can compare and act on.