Watch a rainscreen become a facade.
Panel coordination, from set-out to the reviewed installation package.
Set-out
Coordinate panel modules with the project elevations and opening references.
Support
Review support and panel interfaces for the selected ACM system.
Interfaces
Coordinate joints, returns and opening interfaces against the project details.
Review
Bring the coordinated references together for project-team review.
Read the sequence and scope
- Set-out. Coordinate panel modules with the project elevations and opening references.
- Support. Review support and panel interfaces for the selected ACM system.
- Interfaces. Coordinate joints, returns and opening interfaces against the project details.
- Review. Bring the coordinated references together for project-team review.
Presentation only. Follow the specified project documents, selected system requirements and agreed review responsibilities. The reference geometry is illustrative and not to scale. Existing service limitations and technical notes remain below.
Further service context and original reference images
ACM panel installation
Follow a representative ACM rainscreen from prepared backup wall through fabrication, attachment, drainage and the completed facade.
Original installation references and technical details
Prepare
Approved backup wall or sheathing establishes the attachment plane.
Backup wall
Route → cut → fold → return edges → close corners → cassette
Representative concealed engagement — final detail follows approved system information.
The detail is there when it is needed.
Review installation notes, project requirements and answers to common questions before sending your drawings.
Technical note
Animations are representative and intended to explain general installation sequencing. Final construction must follow approved project drawings, specifications, engineering, consultant direction, manufacturer requirements, tested assemblies and applicable codes.
12-stage sequence transcript
- Prepared substrate
- Air and water-control layer with corners, transitions, windows and penetrations
- Exterior insulation
- Thermal break, clip and fastener
- Girts onto clips
- Drained and ventilated cavity
- Flat sheet to routed-and-returned ACM cassette
- Concealed panel-clip engagement
- Lift, position, lock, align and conceptually fasten the panel
- Base, head, window and parapet flashing with closures
- Rain, drainage and designed airflow
- Completed representative facade
Before construction
Final construction details, materials, fastening, transitions, flashing, substrates, engineering and project requirements must follow approved project documents and applicable requirements.
A coordinated path from drawings to enclosure.
This visual explains the sequencing questions that drawings, substrate conditions, attachment design, fabrication and field coordination must resolve before installation. It is a representative communication aid, not a construction detail.
ACM installation FAQs
Is this animation a construction detail?
No. It is a manufacturer-neutral overview of representative sequencing. Approved project documents, engineering, specifications, tested assemblies and applicable codes govern construction.
What establishes the final fastener and joint requirements?
The approved system information and project design establish substrate suitability, fastener type, spacing, capacity, panel geometry and joint dimensions.
Why is there an open cavity behind the ACM cassette?
The coordinated rainscreen cavity provides intended drainage and designed ventilation paths behind the exterior panel.
What should I send for an estimate?
Share the available architectural elevations, wall sections, details, specifications, schedules and relevant structural information through the project-document upload route below.
See the assembly. Then send the drawings.
Share project drawings or request an exterior-cladding estimate from the Fig Philp Group Inc. team.
Representative installation sequence only — final construction follows approved project documents and applicable requirements.
- Backup wall.
- Substrate preparation.
- Air and water membrane.
- Window and penetration transitions.
- Exterior insulation.
- Thermal clips.
- Fasteners into approved substrate.
- Girts.
- Levelling.
- Drainage cavity.
- Ventilation cavity.
- Flat ACM sheet.
- Routing.
- Cutting.
- Folding.
- Panel returns.
- Completed cassette.
- Representative concealed clip.
- Panel engagement.
- Panel fastening.
- Alignment.
- Joint spacing.
- Base flashing.
- Opening flashings.
- Parapet and corner details.
- Rain entering an open joint.
- Water draining behind panel.
- Air moving through cavity.
- Completed facade.
Permits: Vancouver's own building by-law
Work inside the City of Vancouver runs under the city's own building by-law and permitting process, which is distinct from the provincial code that most other BC municipalities follow. Downtown ACM projects also come with real logistical constraints — tight staging, restricted street access, and coordination around occupied neighbours — that belong in the installation plan from day one, not discovered at mobilization.
ACM panel layouts, rout-and-return details and flashing profiles are also available as a standalone package — see architectural facade shop drawings.