Building Envelope System Installation in Vancouver
Backing, continuity and cladding interfaces coordinated as one project-specific sequence.
Backing
Start with the backing and the specified project references.
Continuity
Coordinate barrier continuity against the selected system details.
Coordination
Review insulation, support and cavity coordination together.
Cladding
Bring cladding and transition references together for review.
Read the sequence and scope
- Backing. Start with the backing and the specified project references.
- Continuity. Coordinate barrier continuity against the selected system details.
- Coordination. Review insulation, support and cavity coordination together.
- Cladding. Bring cladding and transition references together for review.
Presentation only. Follow the specified project documents, selected system requirements and agreed review responsibilities. The reference geometry is illustrative and not to scale. Existing service limitations and technical notes remain below.
A coordinated envelope subcontract — air/vapour barrier, thermal break, sub-girt, rainscreen cladding, transitions and flashings — installed by one team, warrantied by one company.
The building envelope is the only sub-trade that has to hold air, water, vapour, thermal, sound and fire — all at the same time, across every joint, transition and penetration. When it is broken into three or four small subcontracts, the failure point is always the interface between them. We take the whole assembly as a single scope so the interfaces stop being someone else’s problem.
The Envelope as One Continuous Assembly
The Envelope as One Continuous Assembly
Air & Vapour Barrier
Self-adhered or fluid-applied AVB tied into curtain wall, slab edge, parapet and through-wall transitions. Witness-tested where required by the consultant.
Thermal Control Layer
Continuous exterior insulation (mineral wool or rigid) sized to project energy modelling and BC Step Code step. Thermal break clips where the structure permits.
Cavity, Sub-Girt & Drainage
Vertical and horizontal sub-girt set off the AVB plane, rainscreen cavity sized for drainage and pressure-equalization, weep paths at every horizontal break.
Cladding & Flashings
Exterior cladding (ACM, fibre cement, terracotta, phenolic, corrugated, Equitone, Swisspearl) plus head, sill, jamb, parapet and base flashings — all coordinated with our own crew.
What’s Inside an FPG Envelope Subcontract
What’s Inside an FPG Envelope Subcontract
- AVB membrane & sealants
- Thermal control insulation
- Sub-girt & thermal-break clips
- Cladding panels & trims
- Head, sill & jamb flashings
- Parapet caps & copings
- Base-of-wall & sill detailing
- Window & door rough-opening prep
- Curtain wall tie-in & shimming
- Penetration boots & gaskets
- Mock-up panel & consultant review
- Photo log & warranty package
Most envelope failures are not material failures — they are interface failures. We bid the interfaces.
How We Run an Envelope Install
How We Run an Envelope Install
Pre-construction & constructability
Plans, specs and consultant envelope drawings reviewed. Constructability flagged. Allowances explicitly listed. R1 lump-sum estimate inside five business days.
Shop drawings & mock-up
System-specific shops, control-line layout, mock-up panel built and reviewed with architect and envelope consultant before production. Sign-off recorded.
Sequenced production
AVB → insulation → sub-girt → flashings → cladding, advanced in elevation-bands so we are never working over our own membrane. Inspections scheduled to the sequence.
Witness testing & QC
AVB witness pulls, fastener torque QC, flashing-lap photography, weep-path verification. Defects logged and corrected before the cladding closes the wall.
Handover package
Photo log, mock-up sign-off, manufacturer warranties, as-builts, deficiency walk-through and shim/fastener inventory — delivered in one folder at close-out.
BC Step Code & Energy Targets
BC Step Code & Energy Targets
Most current Lower Mainland and Fraser Valley projects are now targeting BC Step Code 3 or 4 on the energy step. The envelope is responsible for roughly half of the gap to those targets. We model the assembly with the project mechanical engineer to confirm the rainscreen cavity, sub-girt thermal bridging and AVB continuity do not erode the modelled performance — and we install to the assembly as drawn, not as approximated on site.
Sectors We Install In
Sectors We Install In
- K-12 education (multi-system facades)
- Healthcare & institutional
- Government & civic
- Mid-rise residential (wood-frame & concrete)
- Commercial podium & tower base
- Light industrial & flex
Geography
Home base Vancouver. We install envelope packages across Metro Vancouver, the Fraser Valley, the Sea-to-Sky corridor, Vancouver Island, the BC Interior. For multi-month projects we mobilize regionally; for shorter scopes we travel from Vancouver.
Frequently Asked
Frequently Asked
Do you take the AVB scope on its own?
Yes, but we prefer to take it bundled with the cladding so we own the entire wall section. AVB-only contracts are accepted where the GC has already awarded cladding to a separate sub.
Will you work design-assist?
Yes — we will sit with the architect and envelope consultant during design development to flag constructability, allowance items and cost drivers before the document is tendered.
What is your warranty?
FPG installation warranty plus the relevant manufacturer warranties for membrane, insulation, sub-girt and cladding panels. Combined warranty document delivered at handover.
How quickly can you mobilize?
For confirmed scopes inside Metro Vancouver, typically two-to-four weeks from contract to first day on site, subject to material lead times on the specified cladding.
Send Your Envelope Drawings
Tender package, design-assist drawings or remediation scope — we will reply with a preliminary estimate inside one business day.
Request a Quote info@figphilpsgroup.caThe complete envelope, drawn in build order
This is the hub drawing: one wall, every layer Fig Philp Group Inc. installs, in the order a crew can actually build it. It autoplays once when it scrolls into view and then holds the finished assembly. Step controls, keyboard stepping and a reduced-motion static view are always available, and there is no audio. The geometry is not to scale and illustrative — a numeric value appears only where a versioned FPG Detail Library record backs it, and every other quantity is shown as a visible HOLD.
Project-specific reference details and governing notes
Transcript — the installation sequence in words
Build order, step by step
- Step 1 — BACKUP STRUCTURE. Steel-stud backup wall — studs between top and bottom tracks, with the parapet framing carried above the roof line at the top of the bay. Everything installed outboard of this line is the building envelope.
- Step 2 — EXTERIOR SHEATHING. Exterior sheathing fastened to the studs closes the backup wall and gives the membrane a continuous substrate. The window rough opening is pre-cut and sheathing joints are staggered so no joint lines up with the opening corners.
- Step 3 — AVB / WRB — CONTINUITY LINE. The air/vapour and water-resistive barrier goes on over the sheathing with shingle-lapped seams, and a single highlighted line traces it as one continuous plane — from the base termination, up the field, into the opening reveals, and up over the parapet. Above the window head and at the wall base the barrier is deliberately left loose, because the flashings that follow tuck up underneath it. Any break in that line is an air leak or a water path, which is why continuity is verified before anything covers it.
- Step 4 — OPENING INTEGRATION + WINDOW. Rough-opening membrane goes in shingle order — sill pan first with its back dam and jamb upturns, jamb strips lapped over the pan, head strip lapped over the jambs, and the barrier’s loose head flap folded down over the head strip last. Then the window is set into the protected opening. Scope responsibility varies by project — coordinate with the approved responsibility matrix.
- Step 5 — BASE FLASHING AT THE BARRIER PLANE. The base flashing is set before anything covers the wall, because its back leg has to go up the barrier plane and the barrier’s loose base flap folds down over it — the only lap order that keeps water on the outside. The shelf slopes outward, the face turns down, and the hem is folded closed on the dry side so no upturn can hold a pocket of water.
- Step 6 — THERMAL CLIPS. Thermally broken clips anchor through the barrier plane back to the studs — these are the only points where the heat path crosses the insulation, so clip count and spacing come from the project’s structural and thermal design, not from this drawing. Every anchor is a deliberate hole in the barrier, so each penetration is sealed to the barrier manufacturer’s requirements.
- Step 7 — CONTINUOUS INSULATION. Semi-rigid mineral-wool boards fit tight between and around the clips and return into the opening reveals — continuous exterior insulation, interrupted only by the clip arms. Board thickness and effective R-value are project design values, so they carry a HOLD here.
- Step 8 — GIRTS — COMMON SUPPORT PLANE. Vertical girts land on the clip tabs and set the common cladding-support plane — every cladding option in this hub hangs off this plane, either directly or through its own system rails. Girt-to-clip fasteners are drawn at every tab, illustrative only.
- Step 9 — DRAINED + VENTILATED CAVITY. Behind every cladding option sits the same drained and ventilated cavity — air enters low above the base flashing, rises behind the cladding, and exhausts high below the parapet cap, while incidental water drains down the barrier face. Cavity depth is set by the clip-and-girt build-out for the chosen system, so it is drawn NTS.
- Step 10 — CLOSURES + FLASHINGS BEFORE CLADDING. Every closure that the cladding will cover goes in now, while it can still be reached. At the base, a perforated screen closes the cavity with its upstand behind the cladding plane — never under it. At the window head, a level closure caps the underside of the insulation from the wall plane out to the cladding plane and weeps onto the primary head flashing tucked beneath its outboard leg. Below the window, a sloped sill flashing with a hemmed drip kicks water clear of the bay underneath, and jamb closures are set to receive the cladding edges.
- Step 11 — CLADDING ALTERNATES — BAY A / BAY B. Bay A closes with fibre-cement panels face-fastened to the girts through open, backer-supported joints; Bay B closes with ACM folded into routed-and-returned cassettes that hang from horizontal carrier rails on concealed hooks. These are alternates — one system is selected per project — and each is drawn with its own true attachment, not a relabelled copy of the other. Both terminate above the base flashing on their own attachment, with a clearance gap, bearing on nothing.
- Step 12 — CLADDING ALTERNATES — BAY C / BAY D. Bay C shows interlocking metal panels — each panel’s concealed flange is fastened to the girts and the next panel’s interlock covers those fasteners, installed bottom-up. Bay D shows extruded terracotta tiles carried on horizontal aluminium rails with clips, their open horizontal joints protected by the tile’s integral baffle profile. Like bays A and B these are alternates, and each terminates independently above the base flashing.
- Step 13 — PARAPET TERMINATION. The membrane carries up and over the parapet to close the continuity line and is tied to the roof system under a separate scope, then a sloped metal cap sheds water to the roof side with hemmed drips at both edges while the cavity exhausts beneath its outboard drip.
- Step 14 — COMPLETE ASSEMBLY. The finished wall holds with callout rings — head, jamb, sill, base, parapet, inside and outside corner — true plan-section corner insets, and animated water paths that exit outward at every flashing, never inward. NTS, illustrative: every quantity that is not backed by a Detail Library record is shown as a visible HOLD.
What the drawing shows
- Steel studs with top and bottom tracks, parapet framing and rough-opening framing
- Exterior sheathing with staggered joints and a pre-cut rough opening
- Continuous air/vapour + water-resistive barrier, shingle-lapped, with flaps held open at the head and base
- Rough-opening membrane set: sill pan with back dam and jamb upturns, jamb strips, head strip
- Window unit (scope per Note 2)
- Sloped base flashing with a closed dry-side hem, installed at the barrier plane
- Thermally broken clip assemblies (base plate, thermal spacer, outer tab) with sealed barrier penetrations
- Semi-rigid continuous exterior insulation returned into the reveals
- Vertical girts forming the common cladding-support plane
- Horizontal carrier rails with drainage/airflow gaps (cassette and tile alternates only)
- Drained and back-ventilated cavity: intake low, continuous rise, exhaust high
- Perforated cavity closure at the base, upstand behind the cladding plane
- Level head closure from the wall plane to the cladding plane, with weeps
- Primary head flashing per ASH-F01-HEAD-FLASHING (REV25) with upturned end dams
- Sloped sill flashing with a hemmed drip kick
- Generic jamb closures across the reveal
- Cladding alternate A: fibre-cement panels, face-fastened, open backed joints
- Cladding alternate B: ACM routed-and-returned cassettes on hook-on carrier rails
- Cladding alternate C: interlocking metal panels with a concealed fastening flange
- Cladding alternate D: extruded terracotta tiles on rails with clips
- Parapet cap flashing, cross-sloped to the roof side, hemmed drips, concealed cleats
- True inside- and outside-corner plan sections with the full stack turning the corner
How the load path works
The load path is drawn explicitly and narrated the same way in every bay: cladding, or its own system rail, hangs from the vertical girt; the girt is fastened to the thermally broken clip tab; the clip is anchored through the AVB/WRB plane back to the steel-stud backup. Bay A face-fastens directly to the girts. Bay B hangs on concealed hooks from horizontal carrier rails fastened across the girts. Bay C fastens through a concealed flange to the girts, with the next panel’s interlock covering those fasteners. Bay D seats in clips on horizontal rails fastened to the girts. No cladding bears on any flashing or closure — each bay terminates on its own attachment with a clearance gap.
How the wall drains and ventilates
One cavity regime serves every alternate: air enters low through the base gap above the base flashing and behind the perforated cavity closure, rises unobstructed behind the cladding, and exhausts high beneath the parapet cap drip. Vertical girts leave the vertical airflow path open; the horizontal rails in the cassette and tile bays are drawn with drainage and airflow gaps so they do not dam the cavity. Incidental water that passes the cladding runs down the AVB/WRB drainage plane. At the window it is intercepted by the level head closure, exits outboard through the closure weeps onto the primary head flashing beneath, and sheds off its sloped shelf and face clear of the frame; end dams stop lateral travel. Glazing water crosses the sloped sill flashing and drips off the hemmed kick onto the bay below. Cavity water at the wall base crosses the sloped base flashing and exits past the closed hem — there is no upturned water pocket at any hem. Parapet water sheds to the roof side of the cross-sloped cap. Every animated water path exits outward; none turns inward.
How the corners are drawn
Both corner insets are true plan sections, not elevations with a trim stuck on. At the inside corner the wall planes meet at the internal angle and the complete stack — studs, sheathing, barrier drawn continuous around the junction with the continuity line carried through, thermal clips, mineral wool butted tight into the junction, a girt near each face, the continuous cavity and the cladding — turns the corner without interruption. At the outside corner the sheathing is mitred at the arris, the barrier is wrapped continuously around it with the continuity line highlighted through the turn, the insulation boards are fitted tight with no void, a girt sits near each face and the cavity runs continuously around the arris. In both insets the corner closure is drawn generically and labelled per the selected cladding system, because each alternate resolves it differently. No corner dimension is stated: the drawing shows geometry — planes, wrap order and continuity — not sizes.
What is on HOLD
The only record-backed figures on this page are the head-flashing values carried from ASH-F01-HEAD-FLASHING (REV25), published with the classification the record holds: project_source, draft status, dimension status field_measure, and presented as a project-specific example rather than a universal standard. Everything below is an open HOLD, resolved only by project drawings, approved shop drawings, approved submittals and the manufacturer’s current instructions:
- Steel stud size, gauge and spacing; track type; rough-opening framing members
- Exterior sheathing type and thickness
- Cladding bay module widths shown for the four alternate bays (layout only, NTS)
- Parapet height above the roof line and roof-membrane tie-in height
- AVB/WRB membrane lap widths, horizontal and vertical
- Sill-pan back-dam and jamb upturn heights, and sill-pan slope to exterior
- Rough-opening clearance and shim dimensions at the window perimeter
- Thermal clip spacing (vertical and horizontal) and clip build-out depth
- Anchor and fastener type, spacing, embedment and edge distance in every layer (Note 3)
- Barrier-penetration sealing method at every clip anchor
- Continuous insulation thickness and effective R-value
- Vertical girt spacing, gauge and stand-off
- Horizontal carrier-rail spacing and rail drainage/airflow gap dimensions
- Cavity depth
- Base intake gap height and net free vent area
- Perforated cavity-closure hole size, open area and upstand height
- Weep and vent opening size and spacing at the head closure, base and parapet — no figure is shown, and no project-specific weep spacing recorded for another system page is reused here
- Head closure projection from the wall plane to the cladding plane
- Fibre-cement panel joint widths and backer dimensions
- ACM cassette rebate / dry-joint width and hook engagement depth
- Metal panel interlock engagement and module height
- Terracotta tile module, rail spacing and baffle joint gap
- Jamb closure sealant joint width and backer-rod size
- Cladding bottom-edge clearance above the base flashing and clearance above grade
- Sill and base flashing slopes, leg lengths and splice/joint treatment
- Parapet cap cross-slope, cleat spacing and cap joint treatment
- Floor-line movement/deflection joint location and gap
- The ASH-F01 alternate end-dam height of 1 in — approval_required per the seed record
- Window frame dimensions, glazing and setting blocks
Governing documents
Project drawings, specifications, approved submittals, manufacturer instructions and applicable codes govern. The FPG Detail Library is a controlled reference and generation resource and does not replace project-specific design or approval.
Scope responsibility varies by project — coordinate with the approved responsibility matrix.
Fasteners shown are illustrative only. Type, material, spacing, embedment, edge distance and structural capacity must follow the approved project design and manufacturer requirements.
Related envelope systems
- Fibre-cement cladding
- ACM panel installation
- Air / vapour barrier installation
- Energy-efficient wall systems
- Thermal clip facade systems
- Rainscreen cladding
- Ventilated facade design
- Metal wall cladding
- Custom flashing and trim fabrication
- Terracotta cladding
- Building envelope remediation
- All services
- Project intake